{"id":17297,"date":"2026-03-24T11:32:12","date_gmt":"2026-03-24T11:32:12","guid":{"rendered":"https:\/\/chargeguru.com\/uk\/?p=17297"},"modified":"2026-03-26T16:42:39","modified_gmt":"2026-03-26T16:42:39","slug":"ozev-grant-changes-property-managers","status":"publish","type":"post","link":"https:\/\/chargeguru.com\/uk\/watts-goin-on-blog\/ozev-grant-changes-property-managers\/","title":{"rendered":"How Changes to OZEV Funding Impacts Property Managers in 2026"},"content":{"rendered":"<p><span style=\"font-weight: 400;\"><em>Recent OZEV grant changes for landlords and property managers are shifting the way EV charging is funded in the UK, creating new challenges for apartment infrastructure.<\/em><\/span><\/p>\n<p>As adoption of electric vehicles (EVs) continues to grow, so as does the requirement for both public and private charging infrastructure. While public charging networks are expanding, private residential charging remains essential \u2013 and this is relatively easy to achieve for those with a driveway. However, for EV drivers\u00a0 living in apartments, and their respective property managers and freeholders, delivery of EV charging becomes more complex.<\/p>\n<p><span style=\"font-weight: 400;\">Government funding is a complicated area to navigate \u2013 and is now even more so following <a href=\"https:\/\/www.gov.uk\/guidance\/changes-to-electric-vehicle-chargepoint-grant-schemes-from-1-april-2026\">recent changes to EV charging grants.<\/a> After 31<\/span><span style=\"font-weight: 400;\">st<\/span><span style=\"font-weight: 400;\"> March, funding for individual chargepoint installations will increase \u2013 which sounds like a positive development. However, the <strong>removal of the electric vehicle infrastructure grants for landlords<\/strong> means many buildings will lack the support needed to make projects viable at scale without third-party funding. While new grant structures require greater investment per building, ChargeGuru continues to offer its <a href=\"https:\/\/chargeguru.com\/uk\/chargeguru-ffs\/\">fully-funded solution for apartment blocks.<\/a><\/span><\/p>\n<p><b>The funding changes property managers should know<\/b><\/p>\n<p><span style=\"font-weight: 400;\">Before these changes, the electric vehicle infrastructure grant for residential landlords meant that up to \u00a3850 per parking bay could be claimed via the OZEV grant scheme. This covered \u00a3500 for infrastructure and \u00a3350 for the charge point. But, under the new scheme, support will drop to \u00a3500, and will only become available once a chargepoint has been installed.\u00a0<\/span><\/p>\n<p><span style=\"font-weight: 400;\">This removed the funding that was initially available to support the installation of the pre-infrastructure, which consists of cabling, distribution and safety systems \u2013 critical to making the installation financially and operationally viable for residents.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">In reality, these changes will make EV charging less accessible for people living in flats and could significantly slow down the shift to electric transport. The policy shift reduces one of the main sources of financial support of EV adoption for those who live in apartments, increases reliance on private capital and poses safety concerns to property leaders.<\/span><\/p>\n<p><b>What\u2019s next for safe, scalable installations?<\/b><\/p>\n<p><span style=\"font-weight: 400;\">As OZEV support is changing and the cost gap between public and home charging is widening, some apartment residents could consider utilising the \u00a3500 OZEV grant to install their own chargers. However, this raises significant challenges around building safety, billing fairness, load management, aesthetics and long-term consistency. Property managers should look towards a coordinated, building wide strategy in order to achieve a solution that is both safe and scalable.\u00a0<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Government funding has always been subject to change, but these shifts have brought to light how quickly the landscape can evolve. By not acting or delaying surveys, property managers risk leaving their residents without access to at-home charging for even longer.\u00a0<\/span><\/p>\n<p><span style=\"font-weight: 400;\">However, alongside these changes, resident expectations are rising. ChargeGuru data found that 74% of drivers feel onsite EV charging is a meaningful factor when deciding where to live. If building managers and owners invest in EV charging solutions, they are only supporting their tenant attraction, retention and long-term asset value.\u00a0<\/span><\/p>\n<p style=\"text-align: right;\"><em>Curious to learn if your portfolio is eligible for zero-cost EV charging infrastructure? <a href=\"mailto:uk-info@chargeguru.com\">Contact us!<\/a><\/em><\/p>\n<p><b>Practical funding scenarios without the OZEV grant<\/b><\/p>\n<p><span style=\"font-weight: 400;\">After 31 March, several funding approaches will remain available for introducing EV charging across your properties.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">One route is for the freeholder to finance the infrastructure directly. This offers a long-term asset upgrade, full oversight of the system, prevention of ad<\/span><span style=\"font-weight: 400;\">\u2011<\/span><span style=\"font-weight: 400;\">hoc resident installations, and the flexibility to expand over time. The trade-off, however, is the upfront capital required, along with the responsibility for ongoing management and maintenance of the charging network.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Another option is a resident co<\/span><span style=\"font-weight: 400;\">\u2011<\/span><span style=\"font-weight: 400;\">funding model, where all residents contribute to shared infrastructure works, and individual chargers are installed when needed. While this provides transparency and shared ownership, it does present challenges: the building must still manage ongoing maintenance and operations, and securing agreement from residents, especially those who don\u2019t have or expect to own an EV, can be difficult.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Third<\/span><span style=\"font-weight: 400;\">\u2011<\/span><span style=\"font-weight: 400;\">party funded solutions offer a middle path by removing upfront costs for both freeholders and residents who don\u2019t want a charger. Providers like ChargeGuru invest in the infrastructure themselves, absorbing the initial outlay. In return, residents receive access to reliable, fairly priced charging points. This model delivers a safe, scalable, and low<\/span><span style=\"font-weight: 400;\">\u2011<\/span><span style=\"font-weight: 400;\">administration solution for buildings, offering a more sustainable long<\/span><span style=\"font-weight: 400;\">\u2011<\/span><span style=\"font-weight: 400;\">term strategy for EV charging in apartment buildings.<\/span><\/p>\n<p><b>2026: Where disruption meets opportunity<\/b><\/p>\n<p><span style=\"font-weight: 400;\">The infrastructure grant application deadline is looming, and only projects that are already well into the planning phase, or physically underway, are likely to be in a position to use the current funding. Despite the shift in available grants, ChargeGuru\u2019s core commitment to closing the \u2018driveway divide\u2019 for flat residents remains absolute. Because of this, from 1st April onwards; freeholders, property managers and RTM directors will still be able to access <a href=\"https:\/\/chargeguru.com\/uk\/property-manager-ev-solutions\/\">ChargeGuru\u2019s fully-funded solution for apartment blocks. <\/a><\/span><span style=\"font-weight: 400;\"><br \/>\n<\/span><\/p>\n<p><b><img decoding=\"async\" loading=\"lazy\" class=\"wp-image-17295 alignleft\" src=\"https:\/\/chargeguru.com\/uk\/wp-content\/uploads\/sites\/12\/2026\/03\/Denis-300x300.jpg\" alt=\"\" width=\"120\" height=\"120\" srcset=\"https:\/\/chargeguru.com\/uk\/wp-content\/uploads\/sites\/12\/2026\/03\/Denis-300x300.jpg 300w, https:\/\/chargeguru.com\/uk\/wp-content\/uploads\/sites\/12\/2026\/03\/Denis-150x150.jpg 150w, https:\/\/chargeguru.com\/uk\/wp-content\/uploads\/sites\/12\/2026\/03\/Denis-768x768.jpg 768w, https:\/\/chargeguru.com\/uk\/wp-content\/uploads\/sites\/12\/2026\/03\/Denis-660x660.jpg 660w, https:\/\/chargeguru.com\/uk\/wp-content\/uploads\/sites\/12\/2026\/03\/Denis.jpg 800w\" sizes=\"(max-width: 120px) 100vw, 120px\" \/><br \/>\nDenis Watling<br \/>\nManaging Director<br \/>\n<\/b>ChargeGuru UK<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Recent OZEV grant changes for landlords and property managers are&#8230;<\/p>\n","protected":false},"author":52,"featured_media":17299,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"content-type":""},"categories":[6,11],"tags":[169,115,164,160,159,52,168,163,165,161,158,121,167,166],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v20.8 (Yoast SEO v21.3) - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>OZEV Grant Changes 2026: Guide for Property Managers<\/title>\n<meta name=\"description\" content=\"The OZEV electric vehicle infrastructure grant for residential landlords is ending. Learn how these changes impact apartment EV projects and how third-party funding keeps your rollout viable.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/chargeguru.com\/uk\/watts-goin-on-blog\/ozev-grant-changes-property-managers\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"How Changes to OZEV Funding Impacts Property Managers in 2026\" \/>\n<meta property=\"og:description\" content=\"The OZEV electric vehicle infrastructure grant for residential landlords is ending. Learn how these changes impact apartment EV projects and how third-party funding keeps your rollout viable.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/chargeguru.com\/uk\/watts-goin-on-blog\/ozev-grant-changes-property-managers\/\" \/>\n<meta property=\"og:site_name\" content=\"ChargeGuru UK | EV Charging Stations Installer\" \/>\n<meta property=\"article:published_time\" content=\"2026-03-24T11:32:12+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-03-26T16:42:39+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/chargeguru.com\/uk\/wp-content\/uploads\/sites\/12\/2026\/03\/CGUK-blog-banner-4-1.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"2240\" \/>\n\t<meta property=\"og:image:height\" content=\"1260\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"edavidson\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"edavidson\" \/>\n\t<meta name=\"twitter:label2\" content=\"Estimated reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"4 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\/\/chargeguru.com\/uk\/watts-goin-on-blog\/ozev-grant-changes-property-managers\/\",\"url\":\"https:\/\/chargeguru.com\/uk\/watts-goin-on-blog\/ozev-grant-changes-property-managers\/\",\"name\":\"OZEV Grant Changes 2026: Guide for Property Managers\",\"isPartOf\":{\"@id\":\"https:\/\/chargeguru.com\/uk\/#website\"},\"datePublished\":\"2026-03-24T11:32:12+00:00\",\"dateModified\":\"2026-03-26T16:42:39+00:00\",\"author\":{\"@id\":\"https:\/\/chargeguru.com\/uk\/#\/schema\/person\/425008baeb2954533f1488a0eb3afa84\"},\"description\":\"The OZEV electric vehicle infrastructure grant for residential landlords is ending. Learn how these changes impact apartment EV projects and how third-party funding keeps your rollout viable.\",\"breadcrumb\":{\"@id\":\"https:\/\/chargeguru.com\/uk\/watts-goin-on-blog\/ozev-grant-changes-property-managers\/#breadcrumb\"},\"inLanguage\":false,\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/chargeguru.com\/uk\/watts-goin-on-blog\/ozev-grant-changes-property-managers\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/chargeguru.com\/uk\/watts-goin-on-blog\/ozev-grant-changes-property-managers\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/chargeguru.com\/uk\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"How Changes to OZEV Funding Impacts Property Managers in 2026\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/chargeguru.com\/uk\/#website\",\"url\":\"https:\/\/chargeguru.com\/uk\/\",\"name\":\"ChargeGuru UK | EV Charging Stations Installer\",\"description\":\"Leader for the design and installation of charging stations for electric vehicles\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/chargeguru.com\/uk\/?s={search_term_string}\"},\"query-input\":\"required name=search_term_string\"}],\"inLanguage\":false},{\"@type\":\"Person\",\"@id\":\"https:\/\/chargeguru.com\/uk\/#\/schema\/person\/425008baeb2954533f1488a0eb3afa84\",\"name\":\"edavidson\",\"url\":\"https:\/\/chargeguru.com\/uk\/watts-goin-on-blog\/author\/edavidson\/\"}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"OZEV Grant Changes 2026: Guide for Property Managers","description":"The OZEV electric vehicle infrastructure grant for residential landlords is ending. Learn how these changes impact apartment EV projects and how third-party funding keeps your rollout viable.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/chargeguru.com\/uk\/watts-goin-on-blog\/ozev-grant-changes-property-managers\/","og_locale":"en_US","og_type":"article","og_title":"How Changes to OZEV Funding Impacts Property Managers in 2026","og_description":"The OZEV electric vehicle infrastructure grant for residential landlords is ending. Learn how these changes impact apartment EV projects and how third-party funding keeps your rollout viable.","og_url":"https:\/\/chargeguru.com\/uk\/watts-goin-on-blog\/ozev-grant-changes-property-managers\/","og_site_name":"ChargeGuru UK | EV Charging Stations Installer","article_published_time":"2026-03-24T11:32:12+00:00","article_modified_time":"2026-03-26T16:42:39+00:00","og_image":[{"width":2240,"height":1260,"url":"https:\/\/chargeguru.com\/uk\/wp-content\/uploads\/sites\/12\/2026\/03\/CGUK-blog-banner-4-1.jpg","type":"image\/jpeg"}],"author":"edavidson","twitter_card":"summary_large_image","twitter_misc":{"Written by":"edavidson","Estimated reading time":"4 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/chargeguru.com\/uk\/watts-goin-on-blog\/ozev-grant-changes-property-managers\/","url":"https:\/\/chargeguru.com\/uk\/watts-goin-on-blog\/ozev-grant-changes-property-managers\/","name":"OZEV Grant Changes 2026: Guide for Property Managers","isPartOf":{"@id":"https:\/\/chargeguru.com\/uk\/#website"},"datePublished":"2026-03-24T11:32:12+00:00","dateModified":"2026-03-26T16:42:39+00:00","author":{"@id":"https:\/\/chargeguru.com\/uk\/#\/schema\/person\/425008baeb2954533f1488a0eb3afa84"},"description":"The OZEV electric vehicle infrastructure grant for residential landlords is ending. Learn how these changes impact apartment EV projects and how third-party funding keeps your rollout viable.","breadcrumb":{"@id":"https:\/\/chargeguru.com\/uk\/watts-goin-on-blog\/ozev-grant-changes-property-managers\/#breadcrumb"},"inLanguage":false,"potentialAction":[{"@type":"ReadAction","target":["https:\/\/chargeguru.com\/uk\/watts-goin-on-blog\/ozev-grant-changes-property-managers\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/chargeguru.com\/uk\/watts-goin-on-blog\/ozev-grant-changes-property-managers\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/chargeguru.com\/uk\/"},{"@type":"ListItem","position":2,"name":"How Changes to OZEV Funding Impacts Property Managers in 2026"}]},{"@type":"WebSite","@id":"https:\/\/chargeguru.com\/uk\/#website","url":"https:\/\/chargeguru.com\/uk\/","name":"ChargeGuru UK | EV Charging Stations Installer","description":"Leader for the design and installation of charging stations for electric vehicles","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/chargeguru.com\/uk\/?s={search_term_string}"},"query-input":"required name=search_term_string"}],"inLanguage":false},{"@type":"Person","@id":"https:\/\/chargeguru.com\/uk\/#\/schema\/person\/425008baeb2954533f1488a0eb3afa84","name":"edavidson","url":"https:\/\/chargeguru.com\/uk\/watts-goin-on-blog\/author\/edavidson\/"}]}},"_links":{"self":[{"href":"https:\/\/chargeguru.com\/uk\/wp-json\/wp\/v2\/posts\/17297"}],"collection":[{"href":"https:\/\/chargeguru.com\/uk\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/chargeguru.com\/uk\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/chargeguru.com\/uk\/wp-json\/wp\/v2\/users\/52"}],"replies":[{"embeddable":true,"href":"https:\/\/chargeguru.com\/uk\/wp-json\/wp\/v2\/comments?post=17297"}],"version-history":[{"count":7,"href":"https:\/\/chargeguru.com\/uk\/wp-json\/wp\/v2\/posts\/17297\/revisions"}],"predecessor-version":[{"id":17309,"href":"https:\/\/chargeguru.com\/uk\/wp-json\/wp\/v2\/posts\/17297\/revisions\/17309"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/chargeguru.com\/uk\/wp-json\/wp\/v2\/media\/17299"}],"wp:attachment":[{"href":"https:\/\/chargeguru.com\/uk\/wp-json\/wp\/v2\/media?parent=17297"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/chargeguru.com\/uk\/wp-json\/wp\/v2\/categories?post=17297"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/chargeguru.com\/uk\/wp-json\/wp\/v2\/tags?post=17297"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}